Last-mile delivery operator, 30-van depot
Manchester outskirts
Case Study
Fleet
Transition 30 diesel Transit vans to electric over 18 months. Build depot infrastructure to charge them overnight. Maximise grant funding. Avoid the DNO reinforcement quote nobody can predict until you ask.
Turnkey 30-socket depot install with full Depot Charging Scheme grant capture and a Flexible Connection that sidestepped a six-figure transformer upgrade.
"We expected the chargers to pay for themselves over five years. The grant team got the maths down to under six months. The board approved it in one meeting."
— Head of Fleet, last-mile delivery operator
Get the complete case study with detailed financials, implementation timeline, and lessons learned.
How UK organisations have rolled this out — with real metrics, in their own words.
Always-on charging across 7 depots for an emergency-response EV fleet, with load management and backup power.
65 vans charged overnight in existing grid capacity — avoiding a ~£200k DNO upgrade — with solar top-ups by day.
Modular AC+DC mix with custom API integration for prototype charging analytics during EV programme ramp-up.
Book a free site survey and get your personalised proposal
We use strictly-necessary cookies to make the site work. With your permission, we'd also use analytics cookies (Google Analytics 4 via GTM) to understand how the site is used. We don't use advertising or marketing cookies. Full detail in our Privacy Policy.