Turn your car park
into a power station

Solar carports combine vehicle protection with clean energy generation and EV charging infrastructure—maximising your car park's potential.

200-300 kWp
Per 50 spaces
25 years
Warranty
EV-ready
Infrastructure

Triple-Value Infrastructure

Shade, generation, and EV readiness in one investment

Vehicle Protection

Premium parking experience

Protect vehicles from weather, reduce interior heat buildup, and enhance employee/customer experience with covered parking.

Clean Energy Generation

180,000+ kWh/year per 50 spaces

Generate significant on-site renewable electricity from previously unproductive space. Reduce grid dependence and energy costs.

EV-Ready Infrastructure

Seamless EV integration

Pre-wired for EV chargers with integrated cable routing and power distribution. Future-proof your parking facilities.

Enhanced ESG Profile

High-impact ESG reporting

Visible sustainability statement demonstrating environmental commitment. Meets corporate net-zero targets and attracts green-conscious clients.

No Roof Impact

Zero roof modification

Generate solar power without roof penetrations, structural loading, or warranty issues. Ideal when roofs are unsuitable for solar.

Asset Value Enhancement

Long-term property value

Increase property value with renewable energy infrastructure and modern amenities. Attract premium tenants and buyers.

Is Your Site Suitable?

Ideal characteristics for solar carport installations

20+ parking spaces available
Minimal shading from trees/buildings
Ground conditions suitable for foundations
Adequate grid capacity for export/import
Car park used during daylight hours
Planning permission achievable
High daytime electricity consumption
Long-term site tenure (10+ years)

Not sure if your site is suitable? We provide free feasibility assessments.

How It Works

From feasibility to live generation in 7 steps

1

Site Feasibility & Survey

1-2 weeks

We assess car park layout, ground conditions, shading, grid capacity, and planning constraints to confirm viability.

2

Structural & Electrical Design

2-3 weeks

Structural engineers design foundations and canopy structure. We model solar generation, EV integration, and grid connection.

3

Planning Application

8-12 weeks

We submit planning applications with visual impact assessments, structural reports, and community benefits. Most applications succeed.

4

DNO Grid Connection

6-10 weeks

Apply for G99 grid connection approval for solar export/import. We handle all DNO coordination and technical requirements.

5

Construction & Installation

6-12 weeks

Foundations, structural steelwork, solar panels, and electrical connections installed. We work in phases to maintain parking access.

6

EV Charging Integration (Optional)

1-2 weeks

Install EV chargers with cable routing through carport structure. Pre-wire for future expansion if not installing immediately.

7

Commissioning & Monitoring

Ongoing

Full system testing, grid connection, and 24/7 remote monitoring. Annual structural inspections and maintenance included.

The Perfect Bundle: Solar Carports + EV Charging

Generate solar power and use it to charge your EV fleet—all under one structure. Maximum efficiency, minimal grid dependence.

☀️

Generate

Solar carport produces clean energy during the day

🔋

Store (Optional)

Add battery to store excess for evening charging

Charge

EV chargers use solar power to fuel your fleet

Who it’s for

Where solar carports earn their keep

Carports work hardest where a sizeable car park, a daytime load, and an EV charging use-case all live on the same site.

Retail & shopping centres

Large daytime car parks aligned with peak generation. Carports add a visible sustainability signal, protect customer vehicles and create a natural home for paid EV charging — see our Meadowhall deployment for the pattern.

Workplace & corporate

Convert under-used staff parking into on-site generation plus EV charging. Staff EV uptake accelerates when there’s a covered bay with a charger — a retention and recruitment lever as well as an ESG one.

Education & public sector

School, college and council estates often have large flat car parks with stable daytime demand. Carports work well with phased OZEV-funded EV charger rollouts to staff and fleet.

Hospitality

Guest vehicles arrive in the afternoon and stay overnight. A carport with destination chargers generates revenue and gives guests a reason to choose your venue — and the structure can integrate branded signage.

Solar carports FAQ

Solar carport questions

Planning, generation, weather, EV integration, and maintenance — answered.

Transform Your Car Park

Get a free feasibility study for solar carports at your site. We'll show you generation potential, costs, and ROI.

Cookies

We use strictly-necessary cookies to make the site work. With your permission, we'd also use analytics cookies (Google Analytics 4 via GTM) to understand how the site is used. We don't use advertising or marketing cookies. Full detail in our Privacy Policy.