Turn your car park
into a power station

Solar carports combine vehicle protection with clean energy generation and EV charging infrastructure—maximising your car park's potential.

200-300 kWp
Per 50 spaces
25 years
Warranty
EV-ready
Infrastructure

Triple-Value Infrastructure

Shade, generation, and EV readiness in one investment

Vehicle Protection

Premium parking experience

Protect vehicles from weather, reduce interior heat buildup, and enhance employee/customer experience with covered parking.

Clean Energy Generation

180,000+ kWh/year per 50 spaces

Generate significant on-site renewable electricity from previously unproductive space. Reduce grid dependence and energy costs.

EV-Ready Infrastructure

Seamless EV integration

Pre-wired for EV chargers with integrated cable routing and power distribution. Future-proof your parking facilities.

Enhanced ESG Profile

High-impact ESG reporting

Visible sustainability statement demonstrating environmental commitment. Meets corporate net-zero targets and attracts green-conscious clients.

No Roof Impact

Zero roof modification

Generate solar power without roof penetrations, structural loading, or warranty issues. Ideal when roofs are unsuitable for solar.

Asset Value Enhancement

Long-term property value

Increase property value with renewable energy infrastructure and modern amenities. Attract premium tenants and buyers.

Is Your Site Suitable?

Ideal characteristics for solar carport installations

20+ parking spaces available
Minimal shading from trees/buildings
Ground conditions suitable for foundations
Adequate grid capacity for export/import
Car park used during daylight hours
Planning permission achievable
High daytime electricity consumption
Long-term site tenure (10+ years)

Not sure if your site is suitable? We provide free feasibility assessments.

How It Works

From feasibility to live generation in 7 steps

1

Site Feasibility & Survey

1-2 weeks

We assess car park layout, ground conditions, shading, grid capacity, and planning constraints to confirm viability.

2

Structural & Electrical Design

2-3 weeks

Structural engineers design foundations and canopy structure. We model solar generation, EV integration, and grid connection.

3

Planning Application

8-12 weeks

We submit planning applications with visual impact assessments, structural reports, and community benefits. Most applications succeed.

4

DNO Grid Connection

6-10 weeks

Apply for G99 grid connection approval for solar export/import. We handle all DNO coordination and technical requirements.

5

Construction & Installation

6-12 weeks

Foundations, structural steelwork, solar panels, and electrical connections installed. We work in phases to maintain parking access.

6

EV Charging Integration (Optional)

1-2 weeks

Install EV chargers with cable routing through carport structure. Pre-wire for future expansion if not installing immediately.

7

Commissioning & Monitoring

Ongoing

Full system testing, grid connection, and 24/7 remote monitoring. Annual structural inspections and maintenance included.

The Perfect Bundle: Solar Carports + EV Charging

Generate solar power and use it to charge your EV fleet—all under one structure. Maximum efficiency, minimal grid dependence.

☀️

Generate

Solar carport produces clean energy during the day

🔋

Store (Optional)

Add battery to store excess for evening charging

⚡

Charge

EV chargers use solar power to fuel your fleet

Who it’s for

Where solar carports earn their keep

Carports work hardest where a sizeable car park, a daytime load, and an EV charging use-case all live on the same site.

Retail & shopping centres

Large daytime car parks aligned with peak generation. Carports add a visible sustainability signal, protect customer vehicles and create a natural home for paid EV charging — see our Meadowhall deployment for the pattern.

Workplace & corporate

Convert under-used staff parking into on-site generation plus EV charging. Staff EV uptake accelerates when there’s a covered bay with a charger — a retention and recruitment lever as well as an ESG one.

Education & public sector

School, college and council estates often have large flat car parks with stable daytime demand. Carports work well with phased OZEV-funded EV charger rollouts to staff and fleet.

Hospitality

Guest vehicles arrive in the afternoon and stay overnight. A carport with destination chargers generates revenue and gives guests a reason to choose your venue — and the structure can integrate branded signage.

Solar carports FAQ

Solar carport questions

Planning, generation, weather, EV integration, and maintenance — answered.

Transform Your Car Park

Get a free feasibility study for solar carports at your site. We'll show you generation potential, costs, and ROI.

Cookies

We use strictly-necessary cookies to make the site work. With your permission, we'd also use analytics cookies (Google Analytics 4 via GTM) to understand how the site is used. We don't use advertising or marketing cookies. Full detail in our Privacy Policy.