14-acre retail park, single-occupier anchor + six sub-tenants
Edge-of-town Midlands
Case Study
Retail / Landlord
Convert two underused bays into destination charging. Capture the EV-driver demographic on routes through the park. Surface the footfall uplift in service-charge and turnover-rent. Avoid CPO contracts that lock out future options.
Two 50kW DC chargers, owner-operated rather than CPO revenue-share. Time-of-day tariff with idle fees defending margin. The dwell-time uplift compounded into turnover-rent through year two.
"We expected dwell time to rise. We didn't expect the 12-minute uplift on the comparison parade tenants alongside. The chargers paid back twice — once on margin, once on rent."
— Asset Manager, regional retail park owner
Get the complete case study with detailed financials, implementation timeline, and lessons learned.
How UK organisations have rolled this out — with real metrics, in their own words.
Always-on charging across 7 depots for an emergency-response EV fleet, with load management and backup power.
65 vans charged overnight in existing grid capacity — avoiding a ~£200k DNO upgrade — with solar top-ups by day.
Modular AC+DC mix with custom API integration for prototype charging analytics during EV programme ramp-up.
Book a free site survey and get your personalised proposal
We use strictly-necessary cookies to make the site work. With your permission, we'd also use analytics cookies (Google Analytics 4 via GTM) to understand how the site is used. We don't use advertising or marketing cookies. Full detail in our Privacy Policy.