Energy PartnersInsights › Grants & Policy

Depot Charging Scheme 2026: How Fleets Get 70% Off Depot EV Charging

The Depot Charging Scheme funds 70% of your depot charging infrastructure — up to £1 million. But the first application window closes on 30 June 2026, and it shuts earlier if the money runs out.

Electric HGVs and vans charging at a logistics fleet depot under a clear blue sky

The Depot Charging Scheme funds 70% of your depot charging infrastructure — up to £1 million. But the first application window closes on 30 June 2026, and it shuts earlier if the money runs out.

A £170m fund to electrify your depot — and a closing window

If you run vans, HGVs or coaches, the Depot Charging Scheme is the most significant EV-charging grant the government has launched for fleets. After a successful 2025/26 pilot, it's now a £170 million multi-year programme running from April 2026 to 2030.

The headline for fleet operators: it part-funds the charging infrastructure at your depot — 70% of charge point and civil costs, up to £1 million across all your sites. Civil works (groundworks, cabling, grid connection) are usually the biggest line item in a depot install, so covering them at 70% changes the maths entirely.

⏰ The first window closes 30 June 2026

The scheme runs in application windows. The first window is open from 25 March to 30 June 2026 — or until the funding is exhausted, whichever comes first. With £28 million allocated to this window, demand is expected to outstrip supply, so the practical deadline may be sooner than 30 June.

If depot electrification is on your roadmap at all, applying in this window is the difference between 70% funding and paying full cost.

What you get

Who's eligible

To qualify, your organisation must:

Why fleets get this wrong

Depot applications are more involved than a simple workplace charger claim: you need to quantify your charging demand, plan the civils and grid connection, specify the right hardware, and build an application a senior sponsor can sign off — all before the window closes. Miss a requirement and the application stalls.

This is exactly what Energy Partners does. We model your depot's charging need, design the infrastructure, handle the grant application end to end, and deliver with £0 upfront through grant funding, nationwide deployment, and installs typically completed in around 4 weeks — helping fleet operators cut running costs by up to 40%.

Check your depot's grant eligibility in 60 seconds

Frequently asked questions

What is the Depot Charging Scheme? A UK government grant that part-funds EV charging infrastructure at fleet depots — 70% of charge point and civil costs, up to £1 million across all sites — to support zero-emission vans, HGVs and coaches.

When does the first application window close? 30 June 2026, or earlier if the funding for the window is exhausted. It opened on 25 March 2026.

Who can apply? UK-registered fleet operators that have run for at least a year, own or lease a UK depot, and run (or plan to run) at least one battery-electric van, HGV or coach.

What does the grant cover that others don't? Unlike the Workplace Charging Scheme, the Depot Charging Scheme covers heavy civil works — the groundworks, cabling and grid upgrades that dominate the cost of a depot install.

The bottom line

The Depot Charging Scheme is the best funding a fleet operator will get for depot electrification — but it runs in finite windows, and the first one closes on 30 June 2026. If electrifying your fleet is anywhere on your plan, check your eligibility now.

All grant figures verified against GOV.UK as of June 2026. Scheme terms, funding windows and deadlines change — confirm current details before applying.

Fleet Audit